Blotmath: Difference between revisions

From Tolkien Gateway
(Add link to Blooting)
(Add pronunciation)
Line 1: Line 1:
{{shiremonths}}
{{shiremonths}}
'''Blotmath''' was the eleventh month of the [[Shire Calendar]], approximately equivalent to modern November (in fact running from 22 October to 20 November on a modern calendar). It was called [[Blooting]] in [[Bree]].<ref>{{App|Calendars}}</ref>
'''Blotmath''' (pronounced Blodmath or Blommath) was the eleventh month of the [[Shire Calendar]], approximately equivalent to modern November (in fact running from 22 October to 20 November on a modern calendar). It was called [[Blooting]] in [[Bree]].<ref>{{App|Calendars}}</ref>


{{references}}
{{references}}

Revision as of 13:58, 21 February 2013

Months in the Shire Calendar
  1. Afteryule (January)
  2. Solmath (February)
  3. Rethe (March)
  4. Astron (April)
  5. Thrimidge (May)
  6. Forelithe (June)
  7. Afterlithe (July)
  8. Wedmath (August)
  9. Halimath (September)
  10. Winterfilth (October)
  11. Blotmath (November)
  12. Foreyule (December)

Blotmath (pronounced Blodmath or Blommath) was the eleventh month of the Shire Calendar, approximately equivalent to modern November (in fact running from 22 October to 20 November on a modern calendar). It was called Blooting in Bree.[1]

References